Mechanical systems should serve the architecture—not fight against it. But too often, air conditioning layouts are treated as late-stage bolt-ons rather than integral design elements.
Mechanical systems should serve the architecture—not fight against it. But too often, air conditioning layouts are treated as late-stage bolt-ons rather than integral design elements.
This leads to duct clashes, rework, ceiling compromises, and variations that could have been avoided.
For architects, main contractors, and project managers working across Hampshire, Berkshire, and Surrey, this blog outlines why early collaboration with your air conditioning partner pays off—in quality, time, and budget.
Late-stage planning causes:
These issues delay sign-off and erode trust between teams. Avoiding them requires earlier input from experienced AC professionals.
A qualified air conditioning partner contributes at RIBA Stage 2 or 3 with:
This approach improves communication between the architectural, structural, and services teams before technical design begins.
ClimateWorks was brought in at RIBA Stage 3 to review the HVAC layout. We identified grille clashes with lighting and structural beams. By collaborating with the M&E consultant and architect, we repositioned five ceiling terminals and rerouted ductwork early—saving £3,500 in ceiling rework.
An interior design firm wanted a clean, visible ceiling layout. Early input allowed us to shift to compact ducted units with minimal trunking, concealed within custom boxing. Coordination took place before fit-out, avoiding changes once finishes were installed.
Working directly with the main contractor and architect, we advised on grille spacing and air throw during early design. Final layouts were signed off in advance of MEP coordination. This avoided late design fees and reduced install time by three days.
“We used to treat AC as something to sort later. With ClimateWorks involved early, we hit fewer clashes and got faster sign-offs from our clients.”
— Lead Architect, Berkshire-based studio (2024)
“The ceiling finishes on our project were critical. Their early advice helped us avoid visible grilles and rerouting headaches.”
— Site Project Manager, Winchester (2023)
Bring your air conditioning partner in:
We work with architects, developers, and contractors across Hampshire, Berkshire, and Surrey to help ensure that air conditioning systems work seamlessly with your building—not against it.
Dr. Julian Carter
Thermal Systems Expert and Technical Advisor at ClimateWorks
Dr. Julian Carter is a highly experienced thermal systems expert with over 15 years in the field, holding a PhD in thermal systems. His career spans academic research, consulting, and teaching, focusing on air conditioning and refrigeration systems. Dr. Carter bridges the gap between theoretical advancements and practical applications, providing expert insights to organisations like ClimateWorks, where his guidance informs decision-making and industry best practices. Notably, he has worked on international projects with organisations such as Daikin Industries, the International Institute of Refrigeration (IIR), and the United Nations Environment Programme (UNEP). Currently a lecturer at Edinburgh University, Dr. Carter combines his expertise with a passion for educating the next generation of engineers and advancing climate control technologies.