Supplied and installed a 22-cassette VRF air conditioning system for Techpoint’s new electronics manufacturing facility in Basingstoke, delivering on time and to a high standard for the M&E contractor.
We delivered the supply and installation of a large-scale air conditioning system for Techpoint’s new purpose-built electronics manufacturing facility in Basingstoke. The £150,000 Air Conditioning project formed part of a new build construction designed to house advanced Surface Mount Technology (SMT) production lines, inspection systems, rapid prototyping services and full supply chain operations.
Our role was to supply and install a 22-cassette Variable Refrigerant Flow (VRF) system supported by three outdoor units, providing accurate temperature control across production floors, offices and specialist workspaces.
Working with the main M&E delivery team, we:
We also provide ongoing servicing and maintenance, giving the end client continued support and peace of mind while helping the M&E contractor deliver a complete package.

“The installation was carried out to a high standard and delivered on schedule. Communication was clear throughout, and the team worked flexibly to fit with our programme.”